Contact Us

Contact Person : Michael

Phone Number : 0086-18658255281

WhatsApp : +008618658255281

Free call

PVC Pipe Fitting Plastic Injection Mold Making 1 Cavity 2316 Stainless Steel Material

Minimum Order Quantity : 1 sets Price : Negotiation
Packaging Details : standard export packing Delivery Time : 30 days
Payment Terms : L/C, D/P, T/T, Western Union Supply Ability : 100 sets one month
Place of Origin: China Brand Name: HAIJIA
Certification: CE ISO9001 Model Number: Mould 132

Detail Information

Mould Cavities: 1 Cavities Mould Steel: 2316
Runner: Cold Runner Mould Life: 3-5 Millon Shot
Usage: Pvc Pipe Fittings Controller Way: Heating Rod
Software: Solidwork,UG, PROE Cycle Time: 20 Seconds Per Shot
High Light:

injection molding mold making

,

plastic injection mold maker

Product Description

PVC Pipe fitting Plastic injection mould PP box 1 cavity 2316 stainless steel material cold runner
 

Mould quality control

For the Q/C of mold, there are 3 steps:

1. Mould Material Q/C

- Mould Steel Checking(Hardness, flaw detection)

- Mould Standard Spare Parts Checking(hardness, size, flaw checking)

2. Mould Making Process Q/C

- design checking (part design, mould design, mould engineering drawing)

- Each part of mould’s size checking after machining according to 2D drawing

- mould testing(check mould running condition)

3. check with customer’s requirement again before mold shipping.

 

Mould Description           

Pneumatic, pin-valve gate, shut-off, free-cut,

PET preform mold with hot runner.

Cavity quantity 24 cavities
Main mould base P20 steel (Nitrogen treatment, HRC 28-32 degree)
Core (punch) and cavity S136 (Vacuum quench treatment, HRC 43-52 degree)
Screw neck (lip) S136
Heating plate H13 steel , Chinese standard manifold.
Heating ring ROTFIL from Italy.
Temperature controller    PID voltage temperature controller

Preform mould configuration

Adopted European mould structure;

 

PET materials go into nozzle tip straightly to improve mould cycle time.

Cooling system on cavity, core. If u require,

we also design the cooling system on neck (slip).

Preforms drop through injection machine central ejector automatically

The controller heat Individual cavities, runner and sprue.

One Temperature zone control one point temperature.

Double-locked, inter-changeable mould components;

Usage life (guarantee) 3,000,000 shots-5,000,000 shots
Warranty Period one year
Delivery time 30-45 days
Port FOB Ningbo FOB Shanghai
Payment

T/T: 30%deposite, 70% balance after approval of all types of samples

but before delivery.

 

Service

a) Engineering and one interpreter can be sent to customer’s factory for first running.

b) one-year after-sale technique support

c) We will supply process pictures of the mould once a week.

You Might Be Into These
Get in touch with us

Enter Your Message

admin@china-haijiang.com
+008618658255281
haijiamc